
Baichy Heavy Industry
When comparing suppliers, many buyers often find themselves stuck not on equipment specifications, but on a more fundamental question: Am I dealing with a factory or an intermediary?
Baichy Heavy Industry chooses to answer this question with figures rather than adjectives. Quotes are up to 20% lower than those from distributor channels—that is the price advantage; the range of complete engineering equipment spans capacities from 30 to 800 tons per hour (TPH)—that is the delivery capability; and service response times are measured in seconds and hours—that is the after-sales commitment. The common source of all three is the factory in Jiaozuo, Henan: quotes are issued directly from there, bypassing any intermediate markups.
1. You are buying a plant, not a machine

Baichy Heavy Industry EPC Crushing Plant Manufacturer
Capacity is a configuration problem, not a catalogue problem. The company builds crushing and screening equipment — jaw, cone and impact crushers with screens and conveyors — and sells it as fixed stone crushing plants rated 30 to 800 TPH on granite, limestone, basalt and construction waste. Where mobility decides, the mobile crawler series reaches 600 TPH with a published 25% fuel saving.
2. One contract, one owner of the risk
An EPC turnkey solution separates buying steel from buying output: design, budget, purchase, construction, trial operation and acceptance in one scope, answerable for quality, schedule, cost and safety.
3. Service promises must carry units
60-second first response, technical reply within 30 minutes, a design scheme within 24 hours, service requests handled 365 days a year, engineers deployable within 7 days, 24/7 remote diagnostics and lifelong spare parts.
4. What a buyer can check before the money moves
Every component undergoes 48 hours of stress testing before shipping, production is controlled through Factory Acceptance Testing, and the company holds ISO and CE certification. The export record is the second check: 20+ years in manufacturing, 5,000+ delivered projects, equipment operating in 150+ countries. The exhibition calendar is the third: bauma CHINA and 2025 shows in four more countries. Baichy Heavy Industry earns its references in public.
5. What this page will not do
It will not quote your plant. A credible quotation needs four inputs: rock type and hardness, maximum feed size, moisture and clay content, and the sizes you sell.
| Capability | Published figure | What it changes |
|---|---|---|
| Years in heavy machinery manufacturing | 20+ years | Familiar circuits, not experiments |
| Equipment operating worldwide | 150+ countries | Export-grade service and parts |
| Delivered global projects | 5,000+ projects | Configurations already proven on similar rock |
| Fixed stone crushing plant range | 30 to 800 TPH | Quarry lines and industrial plants from one source |
| Mobile crawler crusher, maximum capacity | 600 TPH | High tonnage without foundations |
| Mobile crawler series, fuel saving | 25% | Lower diesel cost per tonne |
| Pre-shipment stress test | 48 hours per component | Faults surface in the factory |
| Design scheme turnaround | Within 24 hours | Budget decisions move faster |
| Installation team deployment | Within 7 days | Schedule recovered on site |
| Direct price against a dealer chain | Up to 20% | Capex compared factory to factory |
Note: figures as published by the manufacturer; fuel-saving and price values vary with site conditions, material and configuration.

Baichy Heavy Industry Company Certificate
Frequently asked questions
Q1. Is Baichy Heavy Industry a factory or a trading company?
A factory. Production runs from its own plant at Yuntai Avenue Industry District, Jiaozuo City, Henan, at manufacturer's price, not through a dealer chain.
Q2. What equipment does the company manufacture?
Crushers and screens for aggregate production; powder grinding mills such as 0–50 tph Raymond mills making 30 to 425 mesh powder; and mineral dressing equipment including ball mills and rotary dryers.
Q3. What does an EPC turnkey contract include?
Design, budget, equipment purchase, construction, trial operation and acceptance, with one contractor responsible for quality, schedule, cost and safety.
Q4. How fast is technical support?
60 seconds to first response, an answer within 30 minutes, a design scheme within 24 hours, and service requests handled 365 days a year.
Q5. How is quality verified before shipment?
Every component passes a 48-hour stress test before shipping, under Factory Acceptance Testing, ISO and CE certification.

Baichy Heavy Industry Customer Visits Factory
