Baichy Heavy Industrial Machinery Co., Ltd
Phone/Wechat/Whatsapp:+008615093222637
24 hours online

How To Reduce The Power Consumption Of The Crushing Production Line? 3 Energy-Saving Tips Revealed

2025-07-22 14:40:57
Baichy
plays
Warm Tip:

If you want to know more details about equipment, solutions, etc, please click the button below for free consultation, or leave your requirements!

How To Reduce The Power Consumption Of The Crushing Producti

In the fields of ore processing and construction aggregate production, crushing production lines often account for 40%-60% of the total power consumption of enterprises, which can be called "electricity tigers". The annual electricity bill of a large sand and gravel enterprise exceeds 20 million yuan, of which the crushing process consumes nearly 12 million yuan! How to reduce power consumption while ensuring production capacity? Through 300+ case studies, we have summarized 3 energy-saving techniques that have been ignored by the industry. After some enterprises apply them, the electricity bill drops by 18%, and saving millions of dollars a year is not a dream.

Skill 1: The "golden combination" rule for equipment selection (90% of enterprises choose the wrong one)

1. The "big horse pulling a small cart" misunderstanding that subverts cognition

The traditional view is that it is safer to choose a higher-power equipment, but the measured data shows:

• The jaw crusher has the best energy consumption at a load rate of 85-90%

• The cone crusher has the highest efficiency at a load rate of 75-80%

Actual combat plan:

The stepped configuration of "jaw crusher + cone crusher + vertical shaft impact crusher" saves 12-15% energy compared to a single large-scale equipment combination. After the transformation of a granite processing plant, the power consumption per ton dropped from 3.8kW·h to 3.2kW·h.

2. The neglected "chamber revolution"

The new curved crushing chamber is better than the traditional straight chamber:

• The material passing rate is increased by 23%

• The unit energy consumption is reduced by 8%

• The lining life is extended by 30%

Skill 2: The "fine-tuning secret" of operating parameters (a secret that engineers don't tell)

1. The "heartbeat rhythm" of feeding speed

The best feeding mode is discovered through AI monitoring:

• Pulse feeding (3 seconds fast + 1 second stop) saves 7% energy compared to uniform feeding

• The energy consumption is lowest when the material layer thickness is controlled at 2/3 of the crushing chamber height

2. The "dynamic game" of the discharge port

The benefits of adjusting the discharge port size in real time:

Material hardness Optimal discharge port adjustment strategy Energy saving effect
High hardness Enlarge 1.2-1.5 times Reduce consumption by 9%
Medium hardness Maintain standard size -
Low hardness Reduce 0.8-0.9 times Reduce consumption by 6%

Skill 3: The "3+5" core concept of maintenance (80% of the faults come from here)

1. Three key maintenance nodes

• Bearing lubrication revolution: Using graphene grease, the friction coefficient is reduced by 40%

• "Symmetrical wear" management of hammer head/liner: Deviation exceeding 3mm will lead to a 5% increase in power consumption

• "Golden angle" of transmission system: V-belt tension is kept at 1.5-2mm/100mm for highest efficiency

2. Five intelligent monitoring methods

Install IoT sensor monitoring:

• Real-time current fluctuation (warning of abnormal energy consumption)

• Vibration frequency analysis (prediction of mechanical failure)

• Temperature gradient monitoring (detection of lubrication failure)

• Noise spectrum analysis (identification of cavity blockage)

• Power factor compensation (automatic adjustment to above 0.95)

Case study: The miracle of energy-saving transformation of a central enterprise

Before transformation:

• 200 tons of granite production line per hour

• Power consumption per ton 4.1kW·h

• Annual electricity bill 8.6 million yuan

After implementing 3 major techniques:

• Power consumption per ton reduced to 3.3kW·h (a decrease of 19.5%)

• Annual electricity bill savings of 1.68 million yuan

• The payback period is only 5.8 months

Energy saving is an endless race

These tips are just the beginning of the energy efficiency revolution. Our latest "crushing production line digital twin system" can optimize parameters in advance through virtual commissioning, helping customers reduce power consumption by another 8-12%.

Aerial view of Baichy Heavy Industry 

Baichy Heavy Industry – Your Trusted Partner for Seamless Equipment Operation​​

To ensure optimal performance of your equipment, Baichy Heavy Industry offers:

  • ​​Professional on-site installation guidance​​
  • Comprehensive operator training​​
  • ​​24/7 technical support & maintenance services​​

Our ​​complete after-sales service system​​ guarantees long-term, stable operation of your machinery with minimal downtime.

Protect Your Rights – Only Use Official Channels

To avoid scams and ensure authentic support, contact us exclusively through:

• Official Website​​: www.baichychina.com

• WhatsApp​​: +8615093222637

• Email​​: [email protected]

Your satisfaction is our priority – expect prompt, professional service every time.

(Note: Beware of unauthorized third parties claiming to represent Baichy. Always verify through official contacts.)

Baichy'S-customer-Site-All-Over-The-World.jpg
 

Further reading:

logo.png
mobile-crusher-kefu.png